Friday, 3 March 2017

Lymm Methodist Church

During the past year we have been working with Lymm Methodist Church to analyse the use and condition of the Church buildings and work up a set of strategy options for the short and long term future of the complex of buildings on the site. A range of proposals were put together for consultation, including renovation options to improve access and better cater for the needs of the many local groups which use the site alongside the congregation. Of these, a few outline proposals have been worked into a sketch model to give a more tangible sense of what may be possible within the site constraints.

Lymm Methodist Church Sketch Extension
Sketch Front Extension

Lymm Methodist Church Sketch Extension
Sketch Central Extension

No comments:

Post a Comment